NVIDIA B200 Availability and Price in India (2026): ₹4,59,000 a GPU a Month to Rent, ₹3.7 Crore for an 8-GPU HGX System

Where a B200 can be had in India, on request or by the hour, what it costs to rent or buy, and what it needs in power and networking. Prices are dated and sourced; throughput figures come from published tests, labelled measured or vendor-run.

A matte navy server tray holding four GPU cards with a gold bracket, on warm paper.

As of 14 October 2026, ZenoCloud offers the B200 in Mumbai on request at ₹4,59,000 a GPU a month before tax; the HGX or DGX system is quoted separately. AWS Mumbai lists eight-GPU nodes by the hour. One reseller listed an 8-GPU HGX B200 at ₹3.7 crore in December 2025.

Last verified: 14 October 2026. Figures marked "our maths" are calculated from the sources, not quoted by them. Monthly estimates use 730 hours and ₹95.16 to the dollar (European Central Bank reference rate, 14 October 2026). Throughput figures are labelled measured (conditions published by an independent poster) or vendor-run.

Is the NVIDIA B200 available in India?

Yes, in three forms, each with a different wait.

  1. By the month, from ZenoCloud, on request. The B200 is ₹4,59,000 a GPU a month in Mumbai. It is sourced on request: tell us the GPU count and the date you need it, we reply within one business day, and we confirm the system and its availability in writing before you commit. The HGX or DGX system around the GPUs is quoted separately.
  2. By the hour, from AWS in Mumbai. AWS lists p6-b200.48xlarge, eight B200 GPUs on one node, on demand in Asia Pacific (Mumbai) at $160.65 an hour (checked 14 October 2026). That is the hourly option, if eight GPUs at once and a dollar bill suit you.
  3. To buy, through NVIDIA's OEM partners and Indian resellers. OEMs such as Supermicro build HGX B200 systems; NVIDIA sells the DGX B200. One Indian reseller published an 8-GPU HGX B200 price in December 2025 (table below). We found no PCIe B200 card for sale on its own.

What the market says about waiting. In May 2026 an investor thread claimed B200 rental prices fell 30% in a weekend; the top replies said the opposite, that rental prices were near all-time highs and capacity was "sold out everywhere" on the marketplaces they checked (r/StockMarket, 11 May 2026, 167 comments, reported). A provider that sold B200 on demand in January had no stock by mid-January (r/LocalLLaMA, 9 Jan 2026, reported). A startup looking for long-term B300 rentals was offered build-to-order with a six-to-eight-week lead time and a deposit, and said non-contract hourly prices ran 20 to 50% above contract rates (r/gpu, 20 Sep 2026, reported).

What we did not find: a single Indian buyer asking where to buy a B200. Indian discussion of the B200 is about cloud clusters, allocations and company results, not about individual purchases. If you are buying, you are early; get the OEM quote in writing.

How much does B200 rental cost in India?

ZenoCloud's B200 is ₹4,59,000 a GPU a month in Mumbai, on one rupee invoice, with a one-month minimum. Over 730 hours that is about ₹629 an hour (our maths). The table puts it beside the hourly rates practitioners reported in 2026 and the AWS Mumbai price, all converted to rupees for 730 hours. The reported rates are US-dollar sightings on US clouds and marketplaces, quoted by buyers.

What you pay Rate Date and source Per GPU for 730 hours, our maths
On demand, serverless provider $2.49 an hour, then no stock Jan 2026, r/LocalLLaMA ₹1,73,000
Marketplace on demand "mostly around 6", $6.80 on one marketplace, $11.20 the most expensive found 7 Oct 2026, Hacker News ₹4,17,000 to ₹7,78,000
Implied retail on demand about $6.40 an hour ("$15k rents about 14 B200 for a week") 1 Oct 2026, Hacker News ₹4,45,000
ZenoCloud, Mumbai, fixed monthly ₹4,59,000 a GPU a month (about ₹629 an hour at 730 hours) 14 Oct 2026 ₹4,59,000
AWS p6-b200.48xlarge, Mumbai, on demand $160.65 an hour for 8 GPUs, $20.08 a GPU-hour (our maths) 14 Oct 2026, AWS pricing ₹13,95,000

For a GPU that runs all month, ZenoCloud's ₹4,59,000 sits inside the ₹4.2 to 4.7 lakh that the October marketplace sightings convert to, and at about a third of AWS's per-GPU allocation in Mumbai for the same 730 hours (AWS bills the whole eight-GPU node; see below). The $2.49 sighting is from January, before supply tightened. Ours is a dedicated GPU in Mumbai with a rupee invoice, and the price is fixed for the term.

Did B200 rental really fall 30%? The May thread said so; its top replies said the opposite; Hacker News commenters in October put on-demand at $6 to $7, far above January's $2.49. These reports show changing prices, not a trend, and the date on any price, including ours, matters.

How much does a B200 cost to buy in India?

There is no single-card B200. Buyers asking about a PCIe B100 or B150 were told nobody sells one and that they should look at a 96GB RTX PRO 6000 instead (r/LocalLLaMA, 16 Apr 2026). You buy eight GPUs on an HGX baseboard inside a server, or a DGX B200.

What Price Source
HGX B200, 8 GPUs, complete server, India ₹3,69,99,999 (struck-through ₹4,89,99,999) an Indian server reseller's product page dated 5 Dec 2025 (list available on request)
Per GPU inside that server about ₹46.25 lakh, or $48,600 our maths on the listing above
8x B200 server with 112 CPU cores, 2TB RAM, 33TB NVMe, US "$400k+" a startup's planned purchase, r/LocalLLaMA, 18 Dec 2025, reported
DGX B200 NVIDIA publishes no list price. Specs: 8 Blackwell GPUs, 1,440GB HBM3e, 14.4TB/s NVLink, about 14.3 kW max, 10 rack units, four OSFP ports serving eight ConnectX-7 adapters at up to 400Gb/s NVIDIA DGX B200

The Indian listing is ten months old and predates the 2026 price moves, so treat it as the one public Indian figure we found, not today's quote. Get the OEM quote in writing with delivery date, and budget 18% IGST on import. The tariff entry for HSN 84718000 shows 0% basic customs duty and 18% IGST (Eximpe tariff finder, as at 13 May 2026); whether a complete server lands under that line is for your customs broker.

An HGX B200 node is not a workstation. Four things come with it.

  • Power. ServeTheHome measured an 8-GPU HGX B200 server at roughly 12 to 14 kW under load, fed by twelve 3 kW power supplies (YouTube, 28 Oct 2025, 11:25, measured). NVIDIA rates the DGX B200 at about 14.3 kW max. That is 8,760 to 10,220 kWh a month (our maths), before cooling.
  • Networking. In the reviewed server each GPU had its own 400Gb/s NIC, and the reviewer's lesson for multi-node clusters was that slower networking stalls the GPUs (ServeTheHome, 17:04). The DGX B200 carries eight ConnectX-7 adapters at up to 400Gb/s.
  • Cooling. Supermicro's air-cooled HGX B200 is 8U, the liquid-cooled version 4U; most data centres are not liquid-ready, so air-cooled systems deploy faster (Supermicro, 3 Apr 2026, 2:45 and 3:48; Supermicro, 1 Aug 2025).
  • Colocation. The only rack price in our research is a US one: $1,700 a month for a 30A 208V rack including power and cooling (r/LocalLLaMA, Dec 2025, reported). At 80% loading that circuit gives about 5 kW (our maths), so a 14 kW node needs a high-density hall, not a standard rack. We found no published Indian colocation price for this density; get a quote.

Need a B200 for a few hours or days? Use AWS in Mumbai

For a training run of one to seven days, a benchmark or a proof of concept, rent by the hour. AWS's P6-B200 instances provide eight Blackwell GPUs with about 1.44TB of GPU memory, 192 vCPU, 2 TiB of RAM and 3.2 Tbps networking (AWS EC2 P6 instances). We read the on-demand prices on 14 October 2026.

AWS instance GPUs Mumbai, Linux, $ per hour N. Virginia, $ per hour Per GPU-hour, Mumbai, our maths
p6-b200.48xlarge 8 B200 $160.645 $113.933 $20.08
p6-b300.48xlarge 8 B300 not in the Mumbai on-demand list on 14 Oct 2026 $142.416 n/a

Source: EC2 On-Demand pricing, Linux, Asia Pacific (Mumbai) and US East (N. Virginia), checked 14 October 2026. Prices are in dollars, before tax. The eight GPUs come as one unit; there is no single-B200 size.

The crossover, our maths, for an eight-GPU workload: $20.08 a GPU-hour is about ₹1,911 at ₹95.16 to the dollar, so ₹4,59,000 buys about 240 on-demand GPU-hours in Mumbai. AWS bills the whole node, so compare its full bill (about ₹1.12 crore for 730 hours, our maths) with our complete system quote; the per-GPU arithmetic alone does not settle it. Under roughly 240 hours a month, hourly wins; over it, the monthly GPU costs less, and 730 hours on AWS is about ₹13,95,000 a GPU against ₹4,59,000 with us. The one-week training run one poster was renting B200s for (r/LocalLLaMA, 9 Jan 2026) is 168 hours: AWS territory.

We manage AWS. If you want the hourly node without running the account yourself, our Managed AWS desk watches it 24/7, patches what you approve and explains the bill.

B200 vs RTX PRO 6000 vs H200: what the measurements say

Buyers in the B200 threads keep being told the same thing: test on a cheaper card first, and only pay for Blackwell HBM when the workload needs it. These are the published numbers.

Result Conditions Label Source
2x B200 (NVLink) vs 2x RTX PRO 6000 (PCIe), Qwen3.5-35B-A3B: 1,885 vs 516 output tokens a second (3.65x); mean first-token latency 1.97 s vs 18.3 s vLLM, tensor-parallel 2, 16 simultaneous requests, 1,000 in / 1,000 out measured shahizat, NVIDIA forum, 27 Jul 2026
8x B200 vs 8x RTX PRO 6000 Server Edition: GLM-4.6-FP8 8,037 vs 1,652 tokens a second (4.87x); Qwen3-Coder-480B AWQ 6,438 vs 1,603 (4.02x); GLM-4.5-Air AWQ 9,675 vs 2,291 (4.22x). H200 was 1.8 to 2.1x H100; H100 roughly matched RTX PRO 6000 on the smaller model vLLM, 8K in / 8K out, 64 to 256 concurrent, throughput-optimised vendor-run (a GPU cloud's own benchmark post) r/LocalLLaMA, 11 Feb 2026
8x B200, GLM-5.2 NVFP4: 1,160 output tokens a second on a balanced workload, 790 prompt-heavy, 1,176 decode-heavy vLLM, tensor-parallel 8 with expert parallel, 16 requests, 1,000 to 8,000 tokens in measured NVIDIA forum, 25 Jul 2026
16x B200 across two nodes, Kimi K3: about 313 to 378 output tokens a second for 16 requests vLLM, 8,000 in / 1,000 out measured NVIDIA forum, late Jul 2026
A DeepSeek V4-class model would not fit one B200 but fits one B300, which was cheaper than two B200s small inference startup reported r/gpu, 20 Sep 2026

What the numbers say: in the two published tests above, B200s delivered 3.7 to 4.9 times the output tokens a second of the 96GB PCIe card on multi-user serving in those configurations, and far better first-token latency; HBM3e bandwidth and NVLink between GPUs are the obvious differences. For a model that fits in 96GB and a handful of users, the RTX PRO 6000 at ₹1,10,000 is the value pick; our RTX PRO 6000 guide has those numbers. The H200 at ₹2,20,000 covers the middle: 141GB of HBM3e, NVLink, ready now; the H100 at ₹1,80,000 is in our H100 price guide. The B200 is for the models and concurrency the others cannot hold.

GPU Memory Bandwidth per GPU Interconnect ZenoCloud, per GPU a month
RTX PRO 6000 96GB 96GB GDDR7 ECC 1.6TB/s PCIe, no NVLink from ₹1,10,000, ready now
H100 80GB 80GB HBM3 (SXM) 3.35TB/s SXM NVLink ₹1,80,000, on request
H200 141GB 141GB HBM3e 4.8TB/s NVLink from ₹2,20,000, ready now
B200 180GB 180GB HBM3e (software-visible class) 8TB/s (64TB/s across the 8-GPU DGX, our maths) NVLink, 14.4TB/s aggregate ₹4,59,000, on request

Why some sources say 192GB: NVIDIA material uses both 180GB and 192GB for the B200. We quote the 180GB software-visible class and state the exact system and reported memory in writing (our B200 page explains the two figures).

What moves the B200 price

Contract term. One B300 buyer found hourly non-contract rates 20 to 50% above contract rates (r/gpu, 20 Sep 2026); expect the same shape for B200. Our monthly price is a fixed plan with a one-month minimum; longer terms are quoted.

System, not GPU. A B200 price is a per-GPU share of an 8-GPU node. Compare quotes on the whole node: CPU, RAM, NVMe, the 400Gb/s fabric, and whether the node is yours alone. Ours states the system in writing.

Power and cooling. 12 to 14 kW a node and a liquid-ready or high-density hall. Hosted, that is our problem; bought, it is yours before the first job runs.

Software maturity. NVIDIA-forum threads show teams tuning vLLM and SGLang on Blackwell and hitting version-specific kernel issues; B200 support is ahead of the PCIe Blackwell cards but still moves release to release. Two teams that had already deployed B200 HGX nodes asked NVIDIA, by serial number, for confidential-computing firmware (NVIDIA forum, 24 Jun 2026 and 23 Jun 2026). If you are a regulated buyer who needs confidential computing, ask for it in writing before you sign.

Supply. The sightings above run from $2.49 in January to $6 to $7 in October, with sold-out marketplaces in between. Nobody we read predicted the next move with confidence. A monthly rental lets you leave when the price or the model changes.

When is renting cheaper than buying?

Assumptions for this section: one 8-GPU HGX B200 node at the ₹3.7 crore Indian listing (December 2025), rented at 8 x ₹4,59,000 = ₹36,72,000 a month (our maths; multi-GPU systems are quoted as systems, so take this as the per-GPU arithmetic, not a quote), 730 hours a month.

Input Figure Source and label
Hardware ₹3,69,99,999 for 8 GPUs Indian reseller listing, 5 Dec 2025; today's OEM quote may differ either way
Rent ₹36,72,000 a month for 8 GPUs 8 x ZenoCloud ₹4,59,000, our maths
Power 12 to 14 kW, 8,760 to 10,220 kWh a month ServeTheHome measurement, NVIDIA DGX rating; our maths on hours. At the $0.15 per kWh one US thread uses, ₹1.25 to 1.46 lakh a month; your tariff will differ
Fabric eight 400Gb/s NICs and the switch ServeTheHome; not priced in our sources
Room a high-density or liquid-ready hall Supermicro, ServeTheHome; no Indian price found
Staff, downtime, lead time not priced in any thread the costs owners mention and never price
  • On hardware alone, the listing equals about 10 months of eight monthly GPU prices (₹3.7 crore ÷ ₹36.72 lakh, our maths). That is a ratio between a December 2025 listing and per-GPU arithmetic, not a payback: it excludes the system-quote difference, power, fabric, hall, staff and lead time.
  • Utilisation decides it. A rental vendor's thread puts shared-cluster utilisation at about 30% in practice (r/mlops, 26 Aug 2026, vendor post). Against hourly rental that stretches an hours-based crossover about 3.3 times; against a fixed monthly plan the maths does not move, you use less of what you pay for. A September H200-box calculation came out at 14 months at 100% utilisation, 24 months at 60% and 36 at 40% (r/LocalLLaMA, 25 Sep 2026, posted by a hardware vendor). The shape is the same for B200.
  • Against hourly rental, the break-even is in hours. At AWS Mumbai's ₹1,911 a GPU-hour, ₹46.25 lakh a GPU equals about 2,420 GPU-hours: three and a half months at 24x7.
  • Resale is untested. We found no used-market prices for the B200, so nobody in our sources knows what a two-year-old node fetches. An RTX PRO 6000 owner's worry, "How will we sell our RTX Pro 6000 when it's time to upgrade?" (r/BlackwellPerformance, 5 Oct 2026), applies here too.

Buying makes sense if you will run eight B200s near full utilisation for two years or more, you have a hall with 14 kW a node and a 400G fabric, and you have the people. Without the hall, the order is: prove the workload on AWS by the hour, move to a monthly GPU when the hours pass roughly 240 a month, and buy only when the node would be busy for years.

When ZenoCloud is the right choice

ZenoCloud is the right choice when you need Blackwell HBM for a month or more and want it in Mumbai on a rupee invoice. The B200 is ₹4,59,000 a GPU a month, sourced on request: we confirm the exact HGX or DGX system, GPU count and availability in writing before you commit, and we run the host, the driver and the fabric. Add GPU Infrastructure Care and we watch the node 24/7, P1 response under 15 minutes, from ₹25,000 a node a month (₹50,000 account minimum).

We have run servers since 2009, more than 1,000 of them, on a 99.9% uptime SLA. The quote states the system, the GPU count, the reported memory, CPU, RAM, storage, network and the price before tax. You run your own software.

Not a fit: a run of hours or days, where AWS by the hour costs less (we manage AWS if you would rather not run the account); or a start date next week, because B200 is on request and we will not promise a date we have not confirmed. If the date is fixed, the H200 at ₹2,20,000 is ready now, and for models that fit in 96GB the RTX PRO 6000 at ₹1,10,000 is ready now; ask us to price them alongside the B200.

How to get a B200 quote

Send us five things and we reply within one business day:

  1. Model, framework and precision (FP4, FP8, BF16).
  2. Training or inference, and the target: tokens a second, concurrent users or steps a day.
  3. GPU count: one node of eight, or more.
  4. Storage size, dataset location and whether you need a multi-node fabric.
  5. Start date and term.

Request a B200 quote. The quote states the system, the price before tax and how long it holds. The range is on the GPU cloud page and pricing.

Frequently Asked Questions

Is the NVIDIA B200 available in India?

Yes, on request by the month from ZenoCloud at ₹4,59,000 a GPU in Mumbai, availability confirmed in writing before you commit; by the hour from AWS Mumbai as an 8-GPU node at $160.65 an hour; and to buy as HGX or DGX systems through NVIDIA's OEM partners and resellers.

How much does it cost to rent a B200 per hour?

Practitioners reported $6 to $7 a GPU-hour on US marketplaces in October 2026, $11.20 at the most expensive, and $2.49 in January before supply tightened. AWS Mumbai works out at $20.08 a GPU-hour, billed as an eight-GPU node. ZenoCloud sells by the month: ₹4,59,000, about ₹629 an hour.

Did B200 rental prices really fall 30%?

A May 2026 investor post said so; the top replies said capacity was sold out and prices near highs. Buyers reported $2.49 an hour in January and $6 to $7 in October. These reports show changing prices, not a trend; check the date on any figure.

How much faster is a B200 than an RTX PRO 6000?

3.7 times the output tokens a second in an independent two-GPU test (1,885 vs 516; first-token latency 1.97 s vs 18.3 s), and 4.0 to 4.9 times in a vendor's eight-GPU benchmark, in those configurations. For a model that fits in 96GB, RTX PRO 6000 costs a quarter as much.

What does an 8x B200 server cost, and what power does it need?

One Indian reseller listed an 8-GPU HGX B200 at ₹3.7 crore in December 2025; a US startup quoted "$400k+" the same month. It draws roughly 12 to 14 kW under load with eight 400Gb/s NICs, and needs a high-density or liquid-ready hall.

Can I buy a PCIe B200, or a B100 or B150?

Not that we found. NVIDIA sells the B200 on HGX baseboards and in DGX systems, and buyers who asked about a PCIe Blackwell data-centre card were pointed to the RTX PRO 6000 96GB, which is a PCIe card and is ready now at ZenoCloud for ₹1,10,000 a month.

Is a B300 better than two B200s for a large model?

One startup moved to the B300 when its model would not fit one B200: one B300 was cheaper than two B200s and simpler to run. The B300 has higher FP4 and lower FP64 throughput, so it suits inference over HPC. AWS listed it in N. Virginia, not Mumbai.

Is the ZenoCloud B200 price per GPU or per node?

Per GPU per month, inside an HGX or DGX system that is quoted as a system. Eight GPUs at the per-GPU price would be ₹36,72,000 a month, our maths; the written quote states the exact node, GPU count and reported memory.

Is GST included in B200 rental prices in India?

ZenoCloud quotes before tax and adds GST on the invoice; at 18%, ₹4,59,000 a month bills at ₹5,41,620 (our maths). Imported hardware under HSN 84718000 carries 0% basic customs duty and 18% IGST; confirm the line with your customs broker.

Sources

Checked 14 October 2026 unless dated.

  1. ZenoCloud B200 GPU cloud, GPU cloud pricing, pricing and Managed AWS
  2. Indian reseller product page, HGX B200 8-GPU server, ₹3,69,99,999, page dated 5 December 2025 (list available on request)
  3. NVIDIA DGX B200 specifications
  4. AWS, Amazon EC2 P6 instances and EC2 On-Demand pricing, Linux, Asia Pacific (Mumbai) and US East (N. Virginia)
  5. European Central Bank euro reference rates, 14 October 2026: USD/INR cross-rate ₹95.16 (via frankfurter.dev)
  6. Reddit threads: r/StockMarket, B200 rental price fell 30% (11 May 2026); r/LocalLLaMA, alternatives for B200 rentals (9 Jan 2026); r/gpu, B300 longer-term rentals (20 Sep 2026); r/LocalLLaMA, colocating an 8x B200 cluster (18 Dec 2025); r/LocalLLaMA, PCIe B100 or B150 (16 Apr 2026); r/LocalLLaMA, inference benchmarks across RTX PRO 6000, H100, H200, B200 (11 Feb 2026, posted by a GPU cloud); r/mlops, buy-vs-rent break-even (26 Aug 2026, posted by a GPU rental vendor); r/LocalLLaMA, H200 box break-even (25 Sep 2026, posted by a hardware vendor); r/BlackwellPerformance, resale worry (5 Oct 2026)
  7. Hacker News: @efreak (7 Oct 2026); @user43928 (1 Oct 2026)
  8. NVIDIA developer forum: 2x B200 NVLink vs 2x RTX PRO 6000 PCIe (27 Jul 2026); GLM-5.2 NVFP4 on 8x B200 (25 Jul 2026); Kimi K3 across two 8x B200 nodes (29 Jul 2026); CC-enabled VBIOS requests (24 Jun 2026) and the day before
  9. YouTube: ServeTheHome, inside a 1.44TB HGX B200 server (28 Oct 2025); Supermicro, 8U B200 and B300 systems explained (3 Apr 2026); Supermicro, inside the HGX B200 (1 Aug 2025)
  10. Eximpe tariff finder, HSN 84718000, rates as at 13 May 2026