Skip to main content
AWS Migration Services

Move to AWS with a rehearsed zero-downtime cutover

AWS-specific migration with zero-downtime cutover and post-migration managed ops. We plan, execute, optimize, and stay on — not drop-and-run. India-based team since 2009.

Zero-downtime cutover, rehearsed Migrating workloads since 2009 17 years of infra ops Zero-downtime cutover
Running production workloads for
Revolt MotorsPC JewellerRR KabelImpresarioIntentwiseLoomBhimaBGaussMitutoyo
What AWS migration services means
AWS migration services
AWS migration services move workloads onto AWS specifically, whether lift-and-shift, re-platforming, or re-architecting, with the same team handling planning, cutover, and post-migration management rather than exiting after go-live. ZenoCloud plans and executes these migrations end to end.
Zero-downtime cutover
A zero-downtime cutover switches production traffic to the new AWS environment without a visible outage, using a tested rollback path if the cutover needs to be reversed. ZenoCloud stays on as the managed-ops team after migration, backed by 17 years of infrastructure operations since 2009.
200+
AWS Migrations Completed
100%
Cutovers With a Rehearsed Rollback
17 yrs
Infrastructure Operations
~40%
Post-Migration Bill Reduction
24/7
Cutover Support Team

AWS migration, end to end

Migration is a project. Managed ops is the relationship. We do both — so the team that moves your infrastructure also runs it after go-live.

Discovery and dependency mapping

AWS Migration Evaluator, application portfolio review, and dependency mapping before a single resource moves. We identify what can lift-and-shift vs what needs re-platforming.

Architecture design

VPC layout, IAM roles, security groups, RDS configurations, ECS vs EKS vs EC2 decisions. Architecture is designed before migration starts — not invented during cutover.

Cost baseline from day one

Right-sizing, Reserved Instance and Savings Plan strategy are set during migration, not bolted on later — your first full AWS bill reflects an optimized architecture.

Zero-downtime cutover

Replication-based migration with a brief cutover window. Blue/green DNS switch or load balancer cutover with tested rollback. Rollback verified on the target before we go live.

Post-migration optimization

30-day baseline after cutover, then EC2 right-sizing, Reserved Instance and Savings Plan purchasing, tagging policy for cost visibility, and security hardening review.

Managed ops after migration

Convert the migration project to an ongoing Cloud Ops retainer. Same team, continuous optimization. Most clients see their AWS bill 30–40% lower within 90 days of migration.

Pricing

AWS migration pricing

Migration is priced as a one-time project that converts to ongoing managed ops.

Standard
one-time project

Straightforward stack, up to 10 servers

  • Discovery and dependency mapping
  • VPC + IAM + networking setup
  • Data migration + cutover execution
  • Rollback plan and pre-cutover testing
  • 30-day post-migration monitoring
  • Optional: convert to managed ops retainer
Get a Scope Call
Most Common
Complex
one-time project

Multi-service, database-heavy, 10–50 servers

  • Full discovery, TCO analysis
  • Multi-AZ architecture design
  • Database migration (RDS, Aurora, DynamoDB)
  • ECS/EKS containerization option
  • Zero-downtime cutover with 24/7 support
  • 60-day post-migration support
Get a Scope Call
Enterprise
one-time project

Large estate, compliance-critical, 50+ servers

  • Multi-region AWS architecture
  • Compliance-ready setup (SOC 2, HIPAA, DPDP)
  • Application modernization included
  • Dedicated cutover team
  • 90-day post-migration support
  • Converts to Enterprise managed ops retainer
Scope Enterprise

Managed ops retainer starts at ₹50,000/mo ($600) after migration. Managed ops pricing scales with AWS spend.

Migration only vs migration plus managed ops

Most migration consultants hand you off after go-live. ZenoCloud stays on — and that is where most of the optimization value is captured.

Migration Only
ZenoCloud Migration + Managed
Same team stays on for managed ops
Post-migration right-sizing
Reserved Instance strategy after baseline
Ongoing cost monitoring
24/7 incident response after go-live
Named engineer relationship
Architecture evolves with your product
One-time project deliverable
Why teams migrate with us

200+ AWS migrations. The same team stays on after go-live.

“It's been 17 years with ZenoCloud. More than a vendor — they've been family. Trustworthy, dependable, and always there when we needed them.”
VG
Vinayak Garg
Founder & CEO, LazyGardener
FAQ

Frequently asked questions

What common stacks have you migrated to AWS?
LAMP applications (WordPress, Magento, Laravel) to EC2 + RDS, Java Spring Boot to EC2 or Elastic Beanstalk, Node.js to Lambda or ECS, Python/Django to ECS or EC2, database migrations (MySQL to RDS or Aurora, self-managed PostgreSQL to RDS), and bare-metal workloads to EC2 for compute-intensive workloads. If it runs on Linux, ZenoCloud has likely migrated it.
Will you do a lift-and-shift or will you re-architect?
It depends on your situation and we will be direct about the tradeoffs. Lift-and-shift is fastest and lowest risk — applications run on AWS but the architecture is unchanged. Re-platforming (managed RDS instead of self-hosted MySQL, S3 instead of local storage) delivers cost savings with modest additional work. Full re-architecture (containerization, serverless, microservices) delivers the most long-term benefit but is a larger engagement. Most clients start with lift-and-shift, then re-platform specific components in the 90 days after migration.
How do you handle the AWS Migration Evaluator process?
ZenoCloud runs Migration Evaluator or equivalent tooling during discovery to profile your current on-prem infrastructure — CPU utilization, memory, storage IOPS, and network throughput. This data drives EC2 instance sizing recommendations and avoids the most common migration mistake: over-provisioning EC2 instances by mapping on-prem spec to on-demand instance size without considering actual utilization.
What if we already have an AWS account with existing resources?
That is common. We audit the existing account before designing the migration — existing VPCs, IAM roles, security groups, and resource tagging all factor into the plan. If the existing architecture has significant problems (monolithic VPC, no IAM separation, untagged resources), we address those as part of the migration rather than migrating into a broken environment.
Do you take over our AWS billing?
No. Billing stays in your own AWS account — you keep full ownership of the account and the AWS relationship. We operate with scoped IAM access, which means you can revoke access at any time and nothing about your infrastructure or billing is locked to us.
What is the difference between this page and your general cloud migration page?
The general /cloud/migration/ page covers all cloud targets: AWS, GCP, Azure, and bare metal. This page is AWS-specific — it covers AWS architecture patterns, the Migration Evaluator process, and AWS-specific tooling (DMS, MGN, CloudEndure). If you are migrating to GCP or Azure, start with /cloud/migration/ instead.
Start with the assessment

Migration done right becomes an ongoing cost advantage.

Get a free AWS migration assessment. We scope your environment, identify architecture risks, and map the cutover plan before you commit to anything.