Skip to main content
Load Testing Services

Break It Before Launch

Find out where your infrastructure fails—before your users do. Realistic traffic simulation, bottleneck identification, and actionable fixes.

Why Load Testing Matters

Launch Confidence

Know exactly how many concurrent users your infrastructure can handle before you go live. No surprises on launch day.

Cost Optimization

Identify if you're over-provisioned (wasting money) or under-provisioned (risking outages). Right-size your infrastructure.

Find Bottlenecks

Database queries, API endpoints, cache layers—discover exactly where performance degrades under load.

Plan for Growth

Understand your scaling curve. Know when you need to upgrade and how much capacity each upgrade provides.

Comprehensive Testing

What We Test

Web Applications

  • Homepage load times under concurrent users
  • Login and authentication flows
  • Search functionality performance
  • Checkout and payment processing
  • Form submissions and data processing
  • File uploads and downloads

APIs & Services

  • Endpoint response times
  • Throughput (requests per second)
  • Error rates under load
  • Rate limiting behavior
  • Authentication overhead
  • Payload size impact

Databases

  • Query performance under load
  • Connection pool exhaustion points
  • Read vs write performance
  • Index effectiveness
  • Replication lag under load
  • Cache hit/miss ratios

Infrastructure

  • Load balancer distribution
  • Auto-scaling trigger points
  • CDN cache effectiveness
  • Network bandwidth saturation
  • Memory and CPU utilization curves
  • Disk I/O bottlenecks

Types of Load Tests

Different scenarios require different testing approaches. We design tests that match your actual traffic patterns and business requirements.

Baseline Test

Establish current performance metrics under normal load. This becomes your benchmark for measuring improvements.

Duration: 1-2 hours Load: Normal traffic

Ramp-Up Test

Gradually increase load to find the exact breaking point. Identifies when and where performance starts to degrade.

Duration: 2-4 hours Load: 0% → 150%+ capacity

Stress Test

Push beyond expected capacity to see how the system fails. Tests recovery behavior and failover mechanisms.

Duration: 1-2 hours Load: 200%+ capacity

Endurance Test

Run sustained load over extended periods. Finds memory leaks, connection pool issues, and gradual degradation.

Duration: 8-24 hours Load: 80% capacity

Spike Test

Simulate sudden traffic bursts like flash sales or viral content. Tests auto-scaling speed and burst handling.

Duration: 30-60 minutes Load: 0% → 500% in seconds

Geographic Test

Generate load from multiple global regions simultaneously. Tests CDN effectiveness and geographic performance.

Duration: 2-4 hours Load: Multi-region distributed

Our Process

1

Discovery Call

We discuss your application architecture, expected traffic patterns, business-critical flows, and specific concerns. This shapes the test plan.

2

Test Plan Design

We create realistic user scenarios that mirror actual usage. Not just "hit the homepage 1000 times"—realistic journeys through your application.

3

Environment Setup

We set up monitoring, establish baselines, and ensure we can capture all the metrics needed for meaningful analysis.

4

Test Execution

We run the tests with real-time monitoring. Our engineers watch live and can adjust scenarios on the fly if we discover issues.

5

Analysis & Report

Detailed report with findings, bottlenecks identified, and specific recommendations for improvements with expected impact.

6

Implementation Support

We don't just hand you a report. Our engineers can implement the recommended optimizations and re-test to verify improvements.

What You Receive

Executive Summary

One-page overview for stakeholders. Key findings, risk assessment, and recommended actions in plain language.

Detailed Technical Report

Complete analysis with graphs, metrics, and specific technical findings. Includes methodology and raw data access.

Prioritized Recommendations

Actionable fixes ranked by impact and effort. "Fix this first for 3x improvement" not just "optimize your database."

Capacity Planning Guide

Projections for future growth. "At current growth rate, upgrade database by Q3" with specific thresholds.

Reusable Test Scripts

The actual test scripts we created, so you can run regression tests yourself or schedule regular load testing.

Follow-Up Consultation

30-minute call to walk through findings, answer questions, and discuss implementation priorities.

Common Scenarios

E-commerce

Black Friday Readiness

Simulate 10x normal traffic with realistic shopping journeys. Test checkout under load, inventory updates, and payment processing.

SaaS

Enterprise Onboarding

New client bringing 5,000 users? Test bulk user creation, initial data imports, and concurrent dashboard access.

Media

Viral Content Preparation

Prepare for content going viral. Test CDN cache warming, origin server fallback, and graceful degradation.

API

API Rate Limit Validation

Verify rate limiting works correctly, test API gateway behavior, and ensure quotas enforce properly under load.

Load Testing FAQ

Will load testing affect our production environment?

We typically test against staging environments that mirror production. If production testing is required, we schedule during low-traffic windows and implement safeguards to prevent customer impact.

How long does a load testing engagement take?

A standard engagement takes 1-2 weeks from kickoff to final report. This includes discovery, test design, execution, and analysis. Rush options available for time-sensitive launches.

What tools do you use for load testing?

We use industry-standard tools including k6, Locust, JMeter, and Gatling depending on your stack. We also have custom tooling for specific scenarios like WebSocket testing and GraphQL APIs.

Can you test applications we don't host?

Yes. We can load test any publicly accessible application. For internal applications, we can work with your team to establish secure access for testing purposes.

How do you simulate realistic traffic?

We analyze your actual traffic patterns (if available) or industry benchmarks to create realistic user journeys. This includes think times, varied user behaviors, and geographic distribution.

Do you offer ongoing load testing?

Yes. We can set up automated load testing as part of your CI/CD pipeline, or schedule regular performance testing (monthly, quarterly) to catch regressions early.

Know Your Limits

Find out what your infrastructure can handle before your users do.